Friday the 28th
We will be doing some work Friday if you are around and available!
We will likely be doing work at the clubhouse Friday & hit the trails again Saturday!
8:00 or so at our clubhouse on
368 Pound Road
Please let Sean Pinard know if you can help, smpinard@roadrunner.com
or 603-785-4907
Trail Work Info below
Items listed below we will shoot for but not limited to:
Collect and stack all firewood ready to be stacked
Split remaining wood needing splitting and stack as well
Move logs out of trail
Move rocks and stumps out of trail – if anyone is available with a mini excavator we could use it for some of this
Collect chips and move to trail as needed
Grind stumps near septic
Prep and move drags as needed
Organize basement for storage and ATV’s
Organize smaller machines outside for winter storage
Remove and replace hitch on small atv drag 2” also move
Re- Stack the fire pit wood also move wood from the back to the fire pit area
Re-install wheels & new tires on cargo trailer should be ready
Saturday we will be doing work up on the new trail as well as a continuation of the above!
Saturday – 7:30 for breakfast at our clubhouse on 368 Pound Road
Then hit the trails!
