Below is a list of Trail Work for Saturday December 4th

  • Trail brushing on key trails
  • Remove Bob Silva Bridge signs for re-conditioning / clean any old debris from old bridges
  • Key trail locations put hay and chips as needed and available
  • Install plow sticks around parking lot
  • Repair the toilet in the bathroom, loose on floor
  • Siding on Clubhouse needs paint
  • Brushing in trout pond area
  • 3rd picnic table to be rebuilt

Comments are closed.